Typically one to two weeks end to end: a site visit and written quote within days, a one-day install for most single-suction systems, and a verification test once the fan has run, with results a few days after that. Transactions can compress the sequence.
More detail
The install day itself is the short part: coring the slab, setting pipe and fan, sealing, and wiring fit comfortably in a working day for a standard basement or slab layout, and the system starts holding the house down from the first hour the fan spins. Crawl space membranes and mixed-foundation homes stretch to a second day. The calendar around the install is scheduling and verification: metro demand runs seasonal, with January testing surges and spring real estate both filling books, so the quote-to-install gap moves with the season. When a closing date is the driver, say so in the first call; installers sequence purchase-contract jobs tightly because every party needs the verification number before the table. The measurement at the end is not a courtesy, it is the product: a system without a passing retest is plumbing, not mitigation. See the buyer timeline FAQ for the transaction version.