FAQ

How long does radon mitigation take from call to clean air?

Direct answer

Typically one to two weeks end to end: a site visit and written quote within days, a one-day install for most single-suction systems, and a verification test once the fan has run, with results a few days after that. Transactions can compress the sequence.

More detail

The install day itself is the short part: coring the slab, setting pipe and fan, sealing, and wiring fit comfortably in a working day for a standard basement or slab layout, and the system starts holding the house down from the first hour the fan spins. Crawl space membranes and mixed-foundation homes stretch to a second day. The calendar around the install is scheduling and verification: metro demand runs seasonal, with January testing surges and spring real estate both filling books, so the quote-to-install gap moves with the season. When a closing date is the driver, say so in the first call; installers sequence purchase-contract jobs tightly because every party needs the verification number before the table. The measurement at the end is not a courtesy, it is the product: a system without a passing retest is plumbing, not mitigation. See the buyer timeline FAQ for the transaction version.

Authoritative sources

Ready to get started?

About half of Colorado homes test over the EPA action level, and every metro county is EPA Zone 1. Mon-Sat 8am-7pm.

Call (983) 900-3118Text us

Prefer to text? Open your texting app